search

Smart Metering Project (AMI) – ALDESA CDMX [2018]

Installation of 131,221 AMI meters in strategic areas of Mexico City (Polanco, Zócalo, Tacuba) with a reduction of non-technical energy losses. Improved measurement reliability and fraud reduction and optimized maintenance and modernization of the distribution network. With staff training for managing the new system

Client Need

Replace outdated electromechanical meters with advanced technology enabling remote reading, real-time fault detection, and automation of processes such as disconnections and reconnections—optimizing operations and reducing costs.

Service

Implementation of an Advanced Metering Infrastructure (AMI) solution for a major energy company in Mexico, including the installation of smart meters, remote monitoring, and centralized data management.

Objetive

Reduce energy distribution losses by modernizing the metering system, ensuring accurate user consumption readings, and minimizing fraud or billing errors.

Soluciones aplicadas al mundo actual

Casos de éxito

Retail Chain
The project will drive sales and generate additional revenue through targeted ads and promotions. It will also enable customer behavior analysis in-store, identifying preferred zones and optimizing commercial strategies for maximum impact.
México
Optimizing inter-datacenter connectivity with ACI technology and intelligent load balancing.
A Cisco ACI-based network solution was implemented to interconnect multiple data centers with load balancing and full integration with virtualization tools. This infrastructure ensures high availability, scalability, and operational efficiency.
Global
Renewed network infrastructure for scalable digital transformation.
The organization now has a modernized network that supports the demands of the new digital era, ensuring high operational availability and enhanced information security.
España