Smart Metering Project (AMI) – ALDESA CDMX [2018]
Installation of 131,221 AMI meters in strategic areas of Mexico City (Polanco, Zócalo, Tacuba) with a reduction of non-technical energy losses. Improved measurement reliability and fraud reduction and optimized maintenance and modernization of the distribution network. With staff training for managing the new system
Replace outdated electromechanical meters with advanced technology enabling remote reading, real-time fault detection, and automation of processes such as disconnections and reconnections—optimizing operations and reducing costs.
Implementation of an Advanced Metering Infrastructure (AMI) solution for a major energy company in Mexico, including the installation of smart meters, remote monitoring, and centralized data management.
Reduce energy distribution losses by modernizing the metering system, ensuring accurate user consumption readings, and minimizing fraud or billing errors.
Soluciones aplicadas al mundo actual